Picture of South Porch east side stud work
Download Source File
This shows the east side studwork during assembly, the ground level damp course has not yet been installed. It also shows the C/H and cold water pipes, electrics for the hand water heater and drain for the wash hand basin.
Author: Philip Snow
Digital Archive: Unpublished primary digital archive
Document: Unpublished written work such as manuscripts, dissertations etc. not disseminated to the public.
Year/date of creation: 2020
Rights
Copyright Notes: Philip Snow