Plan showing new level Nave floor
Plan showing the new level floor to the Nave. This was achieved by the removal of all the existing heating pipes located within the aisles. Heat loss replaced by the installation of fan assisted heaters located where current wall radiators are within the Nave. The heating engineers confirmed this was feasible. This is a better arrangement as there is - no concealed pipework; - eliminates concerns about damp in the floor.
Author: Robin Wolley, architect
Digital Archive: Unpublished primary digital archive
Document: Unpublished written work such as manuscripts, dissertations etc. not disseminated to the public.
Year/date of creation: 2022
Rights
Copyright Notes: Yes